Want to Revitalize American Shipbuilding? Change the Shift Schedule

American defense shipyards try to fit most work into the day shift
(USN file image)

As part of our Career Connect Washington Maritime Sector ongoing work, we actively track, document, and inform about emerging technologies and trends. The following article is looking at alternative methods to increase productivity in U.S. shipyards. Go to this link to read the full article https://maritime-executive.com/editorials/want-to-revitalize-american-shipbuilding-change-the-shift-schedule

Previous
Previous

Pacific Northwest Maritime Education Alliance receives excellence designation

Next
Next

USDOT: $500 million for port improvement projects